26
ASSEMBLY STEp 1
A Cut the yellow banding straps and lift the running
deck upward to remove all contents from underneath
the running deck.
B Open
hardware bag 1
.
C Slide
main frame boot
up
console mast
.
Place
right console mast
over
main frame
bracket
.
D Pull
lead wire
through
right console mast
.
After pulling the
lead wire
through the mast, the
top of the
console cable
should be located at
the top of the mast. Detach and discard
lead wire
.
NOTE: Do not pinch
console cable
when
placing the mast onto the
main frame bracket
.
E Attach
console mast
to
main frame
bracket
using 3
bolts (a)
, 3
spring
washers (b
) and 3
arc washers (c)
.
F Slide
main frame boot
down over
main frame
bracket
.
G Repeat steps D–F on other side.
NOTE: Do not tighten bolts until step 3 is complete.
12
11
Summary of Contents for T1xLS
Page 1: ...TREADMILL OWNER S MANUAL T1xLS...
Page 2: ...2...
Page 8: ...8...
Page 9: ...9 BASIC OPERATION...
Page 16: ......
Page 17: ...17 TROUBLESHOOTING MAINTENANCE...
Page 20: ......
Page 22: ...22...
Page 23: ...23...
Page 25: ...25...
Page 32: ...32...
Page 33: ...33 TREADMILL OPERATION...
Page 36: ...36...
Page 44: ...44...
Page 45: ...45 PRODUCT SPECIFICATIONS...
Page 47: ...47...