LITESHEET BriteCor AC Direct BWA Installation Manual Download Page 3

LiteSheet Solutions 

 

Page 

3

 of 

4

 

 

Preparation  

 

1.

 

Turn off power source.  
 

2.

 

Remove luminaire from packaging. 

 

3.

 

Remove lens. 
 

4.

 

Remove knockout from fixture for routing 

incoming power. 

 

Installation 

 

1.

 

Align fixture to surface to be mounted to, 

taking care to locate electrical access in 

the proper location. Insert incoming 

power cables through the knockout hole. 
 

2.

 

Affix luminaire to surface using code 

approved hardware and mounting 

techniques. 
 

3.

 

Carefully remove LED board gear tray, 

making sure to not allow the tray to drop 
suddenly. 

 

4.

 

Attach green ground wire to green 

ground screw. 

 

Reviews: