BVT BriteCor High Bay Installation Manual
Page
6
of
7
Wiring Guide (Cont.)
3.
Connect the incoming ground connection
to the green ground wire provided.
Connect the incoming line power to the
luminaire disconnect provided.
•
Black
–
Line Power (Hot)
•
White
–
Neutral
•
Green
–
Safety Ground
4.
Close the luminaire lid and reinsert the
machine screws. Tighten the screws fully
to ensure a tight seal.