
Page
3
of
4
Preparation
1.
Turn off power source.
Optional Vertical Mounting
(Installation in Sheet Rock)
1.
While holding the 5/8” x 6 ½” aluminum
mounting piece to desired mounting position,
transfer the holes to the drywall. Remove the
mounting piece and drill (2) 5/16” holes.
2.
Fold the anchor in the middle and insert
anchor into one hole and tap flush. Insert red
key to pop open the anchor open behind the
wall. DO NOT HAMMER KEY. Remove red
key. Repeat for remaining hole.