LITESHEET BriteCor AC BWB Installation Manual Download Page 5

LiteSheet Solutions 

 

Page 

5

 of 

7

 

 

Wiring Guide 

 

1.

 

Temporarily remove the (3) screws from 
the front of the luminaire. Loosen the 3 

screws in the back luminaire.   

 

2.

 

Remove the PG 13.5 end cap from the 

fixture. Insert incoming power wires/ 

cable. Reseal the wire port with IP66 or 
Wet Location rated hardware (not 

included.)   

 

Reviews: