LiteGear Modulux 60-14/20-830-2900lm-BK Installation Manual Download Page 4

Installation und Montage

 

Installation

 

ç

ê

L1 

L1 Phase 

L2 

L2 Phase 

L3 

L3 Phase 

N  

Neutral 

     Erde / Ground

Modulux manual

Install Modulux into trackrail

If the fixing lock (9) falls between two 
trackrail, follow Step 1. 

 If the LED-driver lock (6) falls between 
tow trackrail, follow 

Step 2-5.

Screw out the screws from wires box 
(8) and move it to right.

Move the LED driver right or left to 
the free position.

 

Reduce / extend the cables by the 
shifted position. Connect the cables to 
the driver (6) and screw the wires box (8)

 

Install the Modulux into the trackrail

 

Phase arrangement

Compatible with the following 3-Phase trackrail system.

4   Modulux Anleitung

Modulux in Stromschiene montieren

Fällt die Verriegelung (9) zwischen zwei 
Stromschienen folgen Sie 

Schritt 1 

 

Fällt der LED-Treiber (6) zwischen zwei 
Stromschienen folgen Sie 

Schritt 2-5 

.

Schritt / Step 1:

 

Verschieben Sie die Verriegelung(9) 
nach rechts / links um sie zu fixieren

Move the fixing lock right /left  to fix it 
in trackrail. 

Schritt / Step 2: 

Lösen Sie die Schrauben von der 
Kabebox (8) und schieben Sie diese 
nach rechts

Schritt / Step 3: 

 

Schieben Sie den LED-Treiber nach 
rechts oder links in die gewünschte 
Position

 

Schritt / Step 4: 

 

Kürzen / verlängern Sie die Kabel um 
die verschobene Position. Verbinden 
Sie die Kabel mit dem Treiber (6) und 
verschrauben Sie die Kabelbox (8) 

Schritt / Step 5: 

 

Montieren Sie Modulux in die Strom-
schiene

Phasenanordnung 

Kompatibel mit folgendem 3-Phasen Stromschienensystem 

 

Reviews: