2 —
RIGGING
7
Before raising the mast, check that you are well clear of any overhead power lines and ensure that the
boat can be moved to the water without the mast coming in contact with power lines or tree branches
2.1
RUNNING RIGGING
2.1.1
Halyards and Genaker sheets
Genaker sheets (orange) 16m / Genaker tack (pink) 8m / Genaker halyard (grey) 17.50m
2.1.2
Halyards and Mainsail sheet
Mainsail Cunningham (grey) 2.50m /Mainsail halyard (blue) 16.50m / Mainsail sheet (grey) 13m
Summary of Contents for LiteXP
Page 28: ...3 7 NAVIGATION 3 7 2 ROWING ...