Rev: 08.17.21
Page 3
CCD-0004406
Prior to Installation
All screws supporting the Solera 5000 Series Awning assembly must have a backer within the structure of
the wall of the unit. Refer to the unit's manufacturer for proper location.
Resources Required
• 2 - 3 People, depending on task
• Cordless or electric drill or screw gun
• Appropriate drive bits
• Rivet gun (if needed)
• Screwdriver
• #6 x 1/2" hex head screws
• #10 x 3/4" screws
• #12 11/4" screws
• Wire cutters/Strippers
• Non-permanent method of marking
• Silicone sealant or tape
• Silicone lubricant
Installation
Awning Rail Installation
Note:
Awning rail supplied separately.
1.
Position the awning rail along the line where the roof and wall meet or:
A. For pitched awnings, a minimum of 6” above doors or windows
B. For flat awnings, a minimum of 4” above doors or windows
Note:
The awning rail MUST be level and parallel with the floor line of the unit (Fig. 1).
2.
After determining the awning rail's proper location, mark its position with a non-permanent
method of marking.
3.
Seal the back of the awning rail with silicone sealant or tape.
4.
Align the awning rail on the wall and secure with #10 x 3/4” screws, using all fastener holes.
Fig. 1
Roll Tube Assembly
Floor Line
Awning
Rail
Support Arm
Assembly
Support Arm
Assembly