Rev: 09.23.21
Page 5
CCD-0004396
Preventive Maintenance
1.
For optimum performance, the system requires full battery current and voltage. The battery must be
maintained at full capacity.
2.
Check the terminals and other connections at the battery, the controller, and the jacks for corrosion,
and loose or damaged connections.
3.
Remove dirt and road debris from jacks as needed.
4.
If jacks are down for extended periods, it is recommended to spray exposed leveling jack rods with a
silicone lubricant every three months for protection. If the trailer is located in a salty environment, it is
recommended to spray the rods every 4-6 weeks.
Bottom of Jack Motor Override:
Tools needed:
3/8
” drive ratchet and extension,
5/16
” socket
1.
Find the port on the bottom of the jack motor (Fig. 6A).
2.
Remove the rubber plug (Fig. 7A).
3.
Insert the
5/16
” socket into the port (Fig. 8).
4.
Turn override until the jack extends or retracts to desired position.
5.
Insert the rubber plug back into the port after extension/retraction is complete.
Fig. 7
A
Fig. 8
Fig. 6
A