Rev: 10.24.19
Page 3
CCD-0002685
Prior to Installation
All screws supporting the awning assembly must have a backer within the structure of the wall of the unit.
Refer to the unit's manufacturer for proper location of backer material.
Resources Required
Installation
Awning Rail Installation (If Needed)
NOTE:
Awning rail not included.
1.
Position the awning rail along the line where the roof and wall meet or:
A.
For pitched awnings, a minimum of 6” above doors or windows
B.
For flat awnings, a minimum of 4” above doors or windows
NOTE:
The awning rail
MUST
be level and parallel with the floor line of the unit (Fig. 1).
Fig. 1
2.
After determining the awning rail's proper location, mark its position with a non-permanent method of marking.
3.
Seal the back of the awning rail with silicone sealant or tape.
4.
Align the awning rail on the wall and secure with #10 x
3/4
” screws, using all fastener holes.
Roll Tube Assembly
Floor Line
Awning
Rail
Support Arm
Assembly
Support Arm
Assembly
• 2 -3 People, depending on task
• Cordless or electric drill or screw gun
• Appropriate drive bits
• Rivet gun (if needed)
• Screwdriver
• #6 x
1/2
" hex head screws
• #10 x
3/4
" screws
• #14 x 1
1/4
" screws
• Wire cutters/strippers
• Non-permanent method of marking
• Silicone sealant or tape
• Silicone lubricant