Rev: 08.24.21
Page 4
CCD-0004349
5.
Under the sink, slide the metal washer (Fig. 1B) over the supply lines onto the base of the faucet. Make
sure the metal washer is flush against the underside of the sink deck and covering the mounting hole
(Fig. 3A).
6.
Make sure the two screws on the collar are evenly inserted and are flush with the top of the
collar(Fig. 4A).
7.
Screw the collar onto the faucet base all the way up to the metal washer (Fig. 5A).
Note:
Make sure the handle of the faucet is placed in the desired position.
8.
Using a Phillips screwdriver, tighten the two screws (Fig. 5B) on the collar to hold the collar into place.
Note:
The red marked supply line is for hot water and the blue marked supply line is for the cold water.
9.
Thread the nut on the hot water supply line onto the hot water outlet supply valve and tighten with an
adjustable wrench. Do not over tighten.
10. Thread the nut on the cold water supply line onto the cold water outlet supply valve and tighten with
an adjustable wrench. Do not over tighten.
11. Turn the hot and cold water outlet supply valves back on and check for any leaks.
Fig. 4
Fig. 5
A
A
B
Faucet base
A
Sink deck
Be sure to keep dirt and debris from entering the water supply lines as this could cause irregular
water flow.
Fig. 3