LINKRICH LR-13A User Manual Download Page 3

Electric proofer 

best feeling every time you open and close it. 

 

 

 

3.INSTALLATION 

(1)First,take out the foot tube and fix it, then adjust it to balance, 

the end fix the rack tube. 

(2)Voltage:    220V          50Hz

16A

 

(3)Connect anti-leakage switch directly or with socket, in order 

to  safty  you  must  make  sure  of  that  insert  power  plug  to 

anti-leakage socket.   

(4)Set  the  proofer  balance,  reserve  enough  space  for  your 

operation. 

 

4.OPERATION 

(1)Add  water  in  water  chamber  before  using,  water  over  the 

heating tube preventing dry heating. 

(2)Connect power,(red)indicator,proofer is on standby mode. 

(3)Open  the  atomizer  by  clockwise,  yellow  atomizer  indicator 

on, electric thermal tube start working.Set temperature to 100℃, 

adjust the temperature to 80℃ after water boilled. Indicator off 

means  proofer  stop  working  and  enter  auto  automizing 

Reviews: