Linkam Scientific Instruments THMS600 General Manual Download Page 7

THMS600 Parts 

Lid Window Assembly  

To replace the windows in the Stage Lid (1) 
use the Window Tool (2) and align the two 
wide spacing pins to the Tube Clip Holder 
holes and unscrew the Lid Insert (3).  
The Stage Lid and Lid Insert should be turned 
upside down as shown in the diagram 
opposite and reassembled in the order 
indicated.  
The Lid Insert should be screwed down until 
the cover slips are held firmly, then turn the 
assembly over and screw down the Lid Insert 
until it is felt to come to a stop.  

Bottom Window Assembly  

Use two narrow spacing pins of Window Tool 
(2) to align it to the two holes of Window 
Locking Ring (4) and unscrew.  
Reassemble the bottom window as shown in 
the opposite diagram  

Photos/graphics courtesy of linkam.co.uk 

Stage Assembly 

1. Lemo connector for stage lead 
2. Heating element carrier assembly 
3. Stage body 
4. Stage body water connector 
5. Gas purge valve 
6. Y-Sample manipulator 
7. Stage door 
8. Door locking thumbscrew 
9. X-Sample manipulator 
10. Liquid nitrogen cooling connector 
11. Bypass stage body water cooling connector 
12. Sample chamber 

13. Earth safety contact for lid

 

15. Heating element wire 
16. Stainless steel cooling tube 
17. 22mm diameter pure silver  
 

heating block 

18. Platinum temperature sensor 
19. Sample holder ramp 
20. Aperture hole 

21. Vertical Sample Holder

 

1

1

1

1

1

2

2

Summary of Contents for THMS600

Page 1: ...ence much of the information in this guide is gleaned from User Manuals provided by Linkam with purchase of equipment If more information is needed please contact Detector Pool staff at 2 9493 or dp a...

Page 2: ...se follow all APS procedures for safe handling of LN2 The black capillary tube on the LN2 dewar lid is fragile please handle carefully Disconnect the LN2 dewar from the stage before heating above 300o...

Page 3: ...een lower left will appear Select Linkam from the dropdown menu Click Start to start the IOC and medm Use the EPICS control screen lower right to set rate oC min and desired temperature Pump speed is...

Page 4: ...g the tubing connected can damage the tubing and or heater Regarding gas purging Do not use hydrogen or helium due to high thermal conductivity Do not use a gas mixture containing more than 20 oxygen...

Page 5: ...d with w o cooling Crossover null modem cable connects to computer serial port I2C cable connects CI94 to LNP Tube connects to front of LNP Make sure tube is secure LN2 dewar connects to stage securel...

Page 6: ...w with w o cooling Crossover null modem cable connects to computer serial port I2C cable connects CI94 to LNP Tube connects to front of LNP Make sure tube is secure LN2 dewar connects to stage securel...

Page 7: ...ol 2 to align it to the two holes of Window Locking Ring 4 and unscrew Reassemble the bottom window as shown in the opposite diagram Photos graphics courtesy of linkam co uk Stage Assembly 1 Lemo conn...

Page 8: ...Fill the dewar approximately 2 3 full The LNP95 must be switched on before the T95 CI95 system controller The stage chamber needs to be purged of air before starting a cooling experiment See purging p...

Page 9: ...the LNP95 then turn on the T95 CI95 Set the LNP95 to Manual mode Set the T95 CI95 to hold at 40oC Set the LNP95 to a speed of 100 Block the hole in the white plastic pump connector and pinch the narr...

Page 10: ...cooling Linkam ECP Water Circulating Pump It may be necessary to prime the ECP if the water connectors have been removed DP circulating pump with custom housing To ensure proper circulation be carefu...

Page 11: ...windows and the Linkam control screen The following parameters can be set left side Pump speed for LN2 cooling optional this can also be controlled automatically based on the selected cooling rate Upp...

Page 12: ...CS Software Controls Select User Specified and set the high and low limits Click Apply To adjust the scale on the Y axis right click then select PV Limits Thanks to John Hammonds for the EPICS interfa...

Page 13: ...The Detector Pool no longer supports the Linksys software but some beamlines may have it installed on their computers To use the Linkam software make sure that the EPICS IOC is not running From the de...

Page 14: ...ramps If you are using the DSC you may be required to use a Temperature Profile A previously set temperature profile may affect your ability to control the stage If control difficulties occur check t...

Reviews: