
DC1304 QUICK START GUIDE
2
Q U ICK TEST SETU P
Q U ICK TEST SETU P
Q U ICK TEST SETU P
Q U ICK TEST SETU P –
––
– PAR ALLEL CO N TR O L
PAR ALLEL CO N TR O L
PAR ALLEL CO N TR O L
PAR ALLEL CO N TR O L
Q U IC K T E S T P R O C E D U R E
Test Proc
Test Proc
Test Proc
Test Proceeeedure
dure
dure
dure
1.
Connect DC1304 as show n, turn on pow er and adjust
the R BIAS1 pot for 50M H z.
2.
Connect 50 ohm terminator to AIN-(J2) and sinew ave
generator to AIN + (J1).
3.
Connect oscilloscope to VO UTA+ and on the oscillo-
scope display must show a 1Vp-p sinew ave.
4.
Connect oscilloscope to VO UTA- and on the oscillo-
scope display must show a 1Vp-p sinew ave.
5.
Connect 50 ohm terminator to BIN-(J2) and sinew ave
generator to BIN + (J1).
6.
Connect oscilloscope to VO UTB+ and on the oscillo-
scope display must show a 1Vp-p sinew ave.
7.
Connect oscilloscope to VO UTB- and on the oscillo-
scope display must show a 1Vp-p sinew ave.
Summary of Contents for LTC6602
Page 4: ...DC1304 QUICK START GUIDE 4...
Page 5: ...DC1304 QUICK START GUIDE 5...
Page 6: ...DC1304 QUICK START GUIDE 6...
Page 7: ...DC1304 QUICK START GUIDE 7...