
LTL TATM LTL - Vol 1
Issue 1.0
8
3.2 Mooring winches
Remove the equatorial mooring line from its storage bag on the gondola. Make sure that it is not
tangled or knotted. Set the mooring winch control pendant to
LOWER
and
MOOR ONE
.
(a) Pass the sewn-in loop back through itself to form a ‘slipping loop’.
(b) Place the slipping loop around the mooring winch drum and pull it tight. Make sure that the
sewn-in loop is positioned so that the free rope locks back around, to secure the rope onto the
drum.