background image

At Lindab

,

 

good thinking is a philosophy that 

guides us in everything we do. We have made it 
our mission to create a healthy indoor climate – and 
to simplify the construction of sustainable build-
ings. We do that by designing innovative products 
and solutions that are easy to use, as well as of-
fering efficient availability and logistics. We are 
also working on ways to reduce our impact on 
our environment and climate. We do that by de-
veloping methods to produce our solutions using 
a minimum of energy and natural resources, and 
by reducing negative effects on the environment.  
We use steel in our products. It’s one of few materi-
als that can be recycled an infinite number of times 
without losing any of its properties. That means 
less carbon emissions in nature and less energy 
wasted. 

We simplify construction

www.lindab.co.uk

Lindab reserves the right to make changes without prior notice

 

2021-08-07       W00-20-14

Summary of Contents for LinAir 400

Page 1: ...lindab we simplify construction LindabLinAir Heat Pump Ventilator...

Page 2: ...settings Controller defrost settings Controller data queries Controller maintenance settings Content Safety considerations Safety labels Cautions Product dimensions Product specifications Control sys...

Page 3: ...to use volatile solvent volatile oil toluene and other chemicals besides or above the machine Make sure the machine isn t placed on the cable and all electrical cables are secured to avoid injury to t...

Page 4: ...4 LinAir HPV Figure 1 Product dimensions for LinAir 400 Heat Pump Ventilator Product Dimensions Figure 2 Product dimensions for LinAir 500 and 700 Heat Pump Ventilators...

Page 5: ...ns l x w x h mm 890 x 690 x 1015 1040 x 820 x 1440 1040 x 820 x 1440 Net Gross weight kg 134 170 92 120 134 170 220 240 V 50 Hz 220 240 V 50 Hz Refrigerant R410A 0 78kg R410A 0 48kg R410A 0 78kg Table...

Page 6: ...nection 3 If the cable length attached to the unit is insufficient then it is necessary to use the cable connector for cable extension 4 The network cable used by the unit cannot be connected to other...

Page 7: ...s for LinAir 500 and 700 Heat Pump Ventilators 1 Wiring should be done by professionals Power supply 1 1 5mm 2 2 Port P N is for Modbus connection 3 If the cable length attached to the unit is insuffi...

Page 8: ...base of the construction the electrical insulation must be done strictly according to the technical standards of electrical equipment Installation Clearance Reserve enough clearance for maintenance Re...

Page 9: ...al insulated Most of the wiring has been completed before leaving the factory an installer is only needed to connect L N and Earth wires to feed the system and to connect the controller and sensors bo...

Page 10: ...machine should be shut down if it is not used for a long time To protect the machine the power should be connected for 24 hours before it is used If it is shut down in winter please clean the machine...

Page 11: ...auto mode Setting button to set the parameters of the ventilator Timer on off after activating the timer on off function a CLOCK will display on the top left corner When there is system error there w...

Page 12: ...EA fan speed after setting temperature achieved compressor off Figure 10 Settings menu Figure 11 Basic settings Press screen lock at the top right corner to enter the screen lock time setting Figure 1...

Page 13: ...ife time Figure 14 Filter life settings B Press advanced setting and enter the password 3333 to turn to advanced setting page Use advanced setting to set filter life correction value return difference...

Page 14: ...ter the data checking it is for administrators ONLY if there is error displayed on the homepage then view this page to check the details password is 5555 if the ventilator works fine there is no need...

Page 15: ...on ways to reduce our impact on our environment and climate We do that by de veloping methods to produce our solutions using a minimum of energy and natural resources and by reducing negative effects...

Reviews: