A-9
INSTALLATION
POWER WAVE® AC/DC 1000
A-9
A
ARR
C
C 22
A
AR
RCC
1
1
A
AR
RC
C 11
A
AR
RC
C 22
A
AR
RC
C 1
1
A
AR
RC
C 2
2
A
ARR
C
C 11 AA
R
R
C
C 22
S
SYY
S
STTEE
M
M IINN
T
TEE
R
RFFAA
C
CEE
Master Input (S12)
Connects to System
Interface
Arclink Connection
21 Le ad
67 Lead
* Work Cables
K1785-XX
Wire Feeder
Control Cables
K1795-XX Cabl es
* Electrode Cables
Arc link (5 Pin)
Wire Feeder
(14 Pin)
K2282-1
K2362-1
Head
K231-XXX
Work Piece
14 Pin Connector
Work Studs
Electrode Studs
Arclink Output
Work Sense
Lead (21)
Electrode
Sense
Lead (67)
* Refer to "Output Cable guidelines" for recommended cable size.
K1543-XX
Arclink Control Cables
Connection Diagram- Typical Tandem Arc System ( Power Feed 10A Controller)
Arclink Input
Wire Reel
and Mountings
Flux Hopper
Connection
Travel Carriage
Connection
Summary of Contents for POWER WAVE 11124
Page 6: ...v SAFETY v...
Page 7: ...vi SAFETY vi...
Page 43: ...B 5 OPERATION B 5 POWER WAVE AC DC 1000 8 12 7 11 9 10 4 5 13 14 6 15 FIGURE B 5...
Page 68: ...F 3 AC SWITCH WIRING DIAGRAM F 3 POWER WAVE AC DC 1000...
Page 69: ...F 4 AC SWITCH WIRING DIAGRAM F 4 POWER WAVE AC DC 1000...
Page 71: ...NOTES POWER WAVE AC DC 1000...