14. For codes 9812 and below, install the
two leads from the gas solenoid valve
onto the solenoid PC board and
connect the purge switch leads. See
Figure F.18. Also, install plug J2 onto
the control board. See Figure F.12.
15. Install the control box cover and
secure by installing the three screws.
See Figure F.1.
16. Install the wire reel and retaining
collar and close the case door. See
Figure F.1.
TROUBLESHOOTING AND REPAIR
F-33
F-33
LN-25
GAS SOLENOID VALVE AND/OR SOLENOID PC BOARD
REPLACEMENT
(continued)
FIGURE F.19 – GAS SOLENOID VALVE AND SOLENOID PC BOARD REPLACEMENT.
BRASS
FITTING
GAS SOLENOID
ASSEMBLY
MOUNTING
SCREW
GAS SOLENOID
VALVE MOUNTING
SCREW
SOLENOID
PC BOARD
PC BOARD
MOUNTING
SCREW
GAS SOLENOID
ASSEMBLY BRACKET
GAS HOSE
GAS SOLENOID
NIPPLE
GAS SOLENOID
VALVE
Summary of Contents for LN-25
Page 7: ...NOTES vi ...
Page 11: ......
Page 13: ...NOTES A 6 A 6 LN 25 ...
Page 33: ...NOTES D 4 D 4 LN 25 ...
Page 77: ...NOTES G 2 G 2 LN 25 ...
Page 90: ...NOTES G 15 G 15 LN 25 ...