8695 6642 / C
D-14
POSIMATIC PS03
D - ASSEMBLY - INSTALLATION
1 - HANDLING THE
POSIMATIC
Sling the
POSIMATIC
in its wooden packaging as indicated in the drawing.
Unpack the
POSIMATIC
from its delivery packaging.
Sling the
POSIMATIC
, always using the slinging eyes which are provided for moving.
Operator protection :
Helmet - Gloves -
Safety shoes