background image

IS205  ECN3592 

A

B

C

D

SERVICING

 

 

SERVICE ACCESS

 

To access and service the gas control valves 

 

Remove the control knobs and fascia panel to gain access to the valves. 

 

Remove the two screws securing the valve boss and carefully withdraw the spindle  

  from the valve. 

 

Grease as necessary and refit parts. Carry out gas soundness check. 

 

FASCIA PANEL REMOVAL 

 

Remove the debris drawer (A) and fat tray (B). 

 

Remove the control knobs (C). 

 

Remove the screws left and right on the 
underside of the fascia panel (D). Tilt the fascia 
panel from the bottom  up and lift clear of the 
hob top. 

 

 
 
OPERATIONAL CHECK

 

Commissioning must include an operational check of all controls. 

 

 

Check that each burner can be lit at both full rate and low rate. 

 

Check that each burner will remain lit when turned to low rate.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for Silverlink 600 CG4

Page 1: ...IS205 ECN3592 1 User Installation and Servicing Instructions Silverlink 600 Gas Chargrills CG4 and CG6...

Page 2: ...the safety and operating instructions carefully before using this product Please pay particular attention to all sections of this User Guide that carry warning symbols and notices WARNING This is a Wa...

Page 3: ...tructions and should conform to the following requirements Do not obstruct or block the appliance flue Installation must include sufficient ventilation to prevent the occurrence of unacceptable concen...

Page 4: ...nsumption Total gas rate Natural 1 36 m 3 h 1 1 36 m 3 h 1 Total gas rate Propane 1 04 kg h 1 1 04 kg h 1 COMMISSIONING PREPARATION Remove all packaging and protective coatings prior to installation C...

Page 5: ...a level surface ensuring the unit is stable and firmly located Any partitions walls or kitchen furniture in close proximity must be of non combustible materials and not be closer than 50mm from the s...

Page 6: ...this burner using a taper or piezo ignitor wand through the aperture in the fascia panel Do not attempt to light the gas through the heat transfer channels On establishing a flame at the burner keep...

Page 7: ...refit parts Carry out gas soundness check FASCIA PANEL REMOVAL Remove the debris drawer A and fat tray B Remove the control knobs C Remove the screws left and right on the underside of the fascia pane...

Page 8: ...and the heat transfer channels from the appliance Loosen the burner retaining nut AA Lift the burner BB at the rear and withdraw from the bodywork Fit the new burner Re assemble in the reverse order...

Page 9: ...and at the elbow LL Remove the screws at the elbow retaining bracket KK Remove the injector MM with the copper and fibre washers Fit new parts and re assemble Perform gas soundness test of circuit pri...

Page 10: ...nnot accept responsibility for work carried out by other persons Please quote both the model and serial numbers from the data plate attached to the unit Give brief details of the service requirement I...

Reviews: