IS278 ECN2970
Page 6
STAINLESS STEEL LID
Pack contents:-
1 x Stainless Steel Lid
1 x Left Hand Hinge
1 x Right Hand Hinge
4 x M5 x 20 Countersunk Head Screws
2 x M4 x 6 Dome head screws
Right hand hinge screwed in place
1)
Remove the protective black covers from the 4 hinge fixing holes.
2)
With 2 of the M5 screws, fit the right hand hinge next to the compressor
cover.
3)
With the other 2 M5 screws, fit the left hand hinge loosely so it hangs at
approximately 45º.
4)
Offer up the lid against the Right hand hinge and locate the hinge pins.
5)
With the lid in the raised position, lift up the Left hand hinge until located on
the lid’s hinge pins.
6)
Holding the lid in place, tighten up the Left hand hinge’s screws. Fit the
hand.
7)
With both hinges secure, lift the lid by the handle and lower to close.
HI122
Left Hand Hinge
M5 x 20 C/sunk Head Screw
HI123
Right Hand Hinge
Lid Assembly
Hinge mounting points