background image

IS280  ECN2841 

Page 7 

OPERATING INSTRUCTIONS 

CLEANING AND MAINTENANCE 

 

 

 

 

Connect the unit to the electricity supply. 

Ensure that the cable (4) is in good 

condition.

 

 

Switch the unit on (2) and turn the 

temperature controller (1) to the desired 

setting. Wait for about 20 minutes for the 

unit to heat up.  Place the dishes/ 

Gastronorm containers with hot food  

onto the aluminium hob surface. 

Switch on the Infra-red lamp (3). 

 

 

 

 

 

 

 

CLEANING 

 

Disconnect the product from the electricity supply and ensure that it 

is cool to touch, before starting to clean.  Use a mild detergent in hot 

water and a soft cloth. Do not use abrasive creams or scourers.  Use 

a suitable polish on the exterior metal surfaces by spraying onto the cloth (not 

directly onto the steel). 

 

MAINTENANCE 

 

Regular cleaning of the unit is recommended.  No regular 

maintenance is required, but it may be necessary to replace a light 

tube. 

Before operation, replace damaged switches, feet, or control knobs. 

 

 

The Infra-red lamps on LD units are user replaceable. 

Disconnect the unit from the electricity supply and ensure the unit is 

cool to touch. 

The lamp is a “bayonet” type fit. To remove, push the lamp carefully to one side 

into the end connector (against light spring resistance) allowing the other end to 

detach from its connector. Dispose of the old lamp safely.  Fitting the new lamp is 

the reverse of the above sequence. 

 

 

NOTE 

1-  Temperature Controller 

2-  On/Off Switch 

3-  Infra-red Lamp Switch 

4-  Cable 

Summary of Contents for Seal HB2

Page 1: ...IS280 ECN2841 User and Installation Instructions Seal Heated Display Bars HB2 HB3 HB4 LD2 LD3 LD4...

Page 2: ...ety and operating instructions carefully before using this product Please pay particular attention to all sections of this User Guide that carry warning symbols and notices WARNING This is a Warning s...

Page 3: ...5 Pack contents 5 Spare parts list 5 Installation 6 Connecting to the electricity supply 6 Operating instructions 7 Cleaning and maintenance 7 Service information 8 Conditions of guarantee 8 USE OF T...

Page 4: ...water jet REMOVAL OF PACKAGING In the interest of hygiene you should clean the product after unpacking and ensure all plastic coatings are removed before use Take care when moving this unit GENERAL Do...

Page 5: ...15 19 Accessory LDBM2 LDBM3 LDBM4 HBBM2 HBBM3 HBBM4 GN container capacity 2 3 GN 2 3 4 2 3 4 Overall Height mm 180 180 180 HB Heated Base or LD Heated Display with integral light gantry and sneeze scr...

Page 6: ...otherwise the unit will overheat For safety regulations the plug must always be accessible Fixing diagram for LD sneeze screen using supplied fasteners CONNECTING TO THE ELECTRICITY SUPPLY Ensure that...

Page 7: ...courers Use a suitable polish on the exterior metal surfaces by spraying onto the cloth not directly onto the steel MAINTENANCE Regular cleaning of the unit is recommended No regular maintenance is re...

Page 8: ...em Product code type number and serial number of unit both on serial plate Code number of spare part see spare parts list P 5 if known Lincat reserve the right to carry out any work under warranty dur...

Reviews: