IS 610 ECN 3946
Page 10 of 13
Cut out switch in lifting box
Remove the branding plates, level indicator and splash back.
Remove the screws securing the lifting box cover, tilt the cover forward, unhook and
lift away.
Remove the cables and transfer to the new switch.
Remove the old switch and reassemble by reversing the above sequence.
Neon
Pull off the filling tap handle, taking care not to lose the blue pip, and remove the
filling tap bezel if required.
Remove the screws securing the facia to the base panel. Remove all control knobs
and free the facia by pulling towards you from the bottom.
Remove the cables from the neon and free the neon by unscrewing the retaining
collar.
Fit new neon and reverse the procedure to reassemble; using adhesive to secure
the bezel if removed.
Energy regulator
Remove the facia as detailed for neon replacement above.
Disconnect cables from the energy regulator terminals and fit to new regulator.
Unscrew the old regulator and refit the new regulator by reversal of the above
procedure.
Safety thermostat
Remove the facia as detailed above.
Remove the safety thermostat retaining screws. Loosen the phial bracket screws
until you can ease out the phial.
Replace the old thermostat with the new one and reverse the above procedure to
reassemble the appliance.
Check the appliance for electrical safety.