background image

"JSQPSU3PBE'BMM3JWFS."t t'BY 

We reserve the right to change details of design, materials and finish.

XXXMJHIUPMJFSDPN½1IJMJQT(SPVQt

Lighting Systems 

IS-CTS3_GRID 

1BHFPG

*OTUSVDUJPO4IFFUGPS"TTFNCMZBOE*OTUBMMBUJPOPG$54(SJE'JYUVSFT

#

Drop Fixture in 4” on 
Center T Grid Opening. 
And Hang Fixture fro

m

 

Structure Above. Make 
Sure Fixture is Leveled 
Lengthwise and Width-
wise.

3”

Figure 1

Secure to Grid Using 
Provided Clips. Provide 
Power to Fixture Through 
Access Plate and Test.

Clip

3”

Figure 2

Install Diffuser Provided 
with Fixture. Lens or 
Louver

3”

Figure 3

Individual Installation

A. 

1MBDFmYUVSFJOEFTJSFEMPDBUJPOBOETVQQPSUCPUIFOETXJUIIBOHXJSFTGSPNTUSVDUVSFBCPWF"MTPTFDVSFCPUI

1. 

TJEFTXJUIHSJEMPDLJOHDMJQT
3FNPWFBDDFTTQMBUFPOUPQPGmYUVSFUPHBJOBDDFTTUPTQMJDFDPNQBSUNFOUSFNPWFBw,0GSPNBDDFTT

2. 

QMBUFBOEQVMMOFDFTTBSZXJSFTPVUPGmYUVSF
1SPWJEFQPXFSUPmYUVSFQFS/&$MPDBMDPEFTBOESFJOTUBMMBDDFTTQMBUF

3. 

-BNQBMMmYUVSFTXJUIEFTJHOBUFEMBNQTBOEUFTU

*OTUBMMBMMEJGGVTFSTQSPWJEFEXJUImYUVSFT

 

Reviews: