Pro King 9XLT
Jan. 2022
11
Step 7: installation of steel cable (Fig. 20)
Fig.20
Main column
1. Put on the column top caps as Fig. 18. The one for main column is with holes (Fig.21).
2. Pull the cylinder to make sure that the cables are long enough.
3. Put on the cable-cut safe roller on the latch (Fig. 22a)
4. Get the cables out from the end of the platforms then round the
rollers and be fixed on the column top (Fig. 22b).
Fig. 21 Fig. 22a Fig. 22b