6
TOOLS AND HARDWARE REQUIRED
X
SECTION 1 (CONTINUED)
1/2"
(13 mm)
(x2)
1.4
• On the underside of the Backboard, place
Steel Spacers (ACS)
onto the
Tap Bolts (ABG)
, and secure the
Nylock Flange Nuts
(ABK)
onto the Tap Bolts.
ACS
(x2)
AAV
(x2)
ALD
AAV
AAV
ALX
AJI
ABG
1.3
• Connect the
Rim (ALX)
and
Plastic Guard (ALD)
to the
Backboard (AJI)
with the hardware shown. Thread the
Jam Nuts (AAV)
all
the way down on the
U-Bolt (BNP)
.
AAV
(x2)
ABK
ABK
ACS
ABG
• The Backboard Brackets
shown here are not included
with this system. See page 10
for more details.
!
ABK
(x2)