![Lifetime Sentinel 6414 Owner'S Manual With Assembly Instructions Download Page 35](http://html1.mh-extra.com/html/lifetime/sentinel-6414/sentinel-6414_owners-manual-with-assembly-instructions_1911074035.webp)
35
20
Install Front Roof Section
20a
Install Outer Roof Panels A & B (AC & AG) at the front of the
shed. Always start inserting screws at the top of the Roof
Panel.
See Assembly Tip #9 (above).
AC
AG
Hardware Bags: 1009126
FE
()
Screwdriver
Step 20 Hardware
Note: This is an interior upward view.
Note: This is an interior upward view.
2
3
Connect Outer Roof Panels to the Gable and Truss
Note: You may need to apply pressure
to walls or roof panels to get screw
pilot holes to line up.
1. Line-up slots in gable with holes in
the Outside Roof Panel. Do not insert
screws into any slot unless you can see
the pilot hole behind the slot.
**2. Starting at the top of the
Gable, screw the Panel to the
Gable.**
-Do Not Completely tighten the screws
until all are in place.-
3. Starting at the top of the Panel,
screw the Panel to the Truss.
4. Fit the top of the wall into the
groove at the bottom of the Roof Panel.
Attach with screws.
1
Assembly T
ip #9
4
Summary of Contents for Sentinel 6414
Page 1: ......
Page 41: ...41 This page intentionally left blank...