7
The Ground Sleeve provides an
alternative to cementing the pole into
the ground permanently. See Page 6 for more
information.
3
24”
18”
14.5”
BP
1
%JHBSPVOEIPMFwEFFQBOEwJO
diameter. The edge of the hole should be
flush with the edge of the playing surface.
.BLFBNBSLwVQ
from the dimpled end
of the Bottom Pole (BP) (do not
scratch the powder coating).
2
.JYCBHTPGDPODSFUFGPMMPXJOHUIFEJSFDUJPOTPOUIFDPODSFUFCBHT
"UIJDLFSNJYPGDPODSFUFXJMMESZTUSPOHFS
Fill the hole to the top with concrete.
Insert the dimpled end of the Bottom Pole into
UIFDFNFOUVQUPUIFwNBSL
Save a 1/2 bag of concrete for use later in the assembly.
Form the cement into a downward slope away from the
pole to allow water runoff.
Failure to do so may result in
premature rusting of the pole.
The slots in the Bottom Pole must
be parallel to the playing surface. If
necessary, insert a straight object, a ruler,
wire, etc., through the slots in the Bottom
Pole and rotate the pole until the object is
parallel to the playing surface.
If the pole is buried too deep or too shallow, the Rim will
not be at the correct height.
Playing Surface