
9
Step – 2: Once all the parts are inspected for correct positioning make sure that the pump cable is running through the
locks and is locked in place with the Rubber Cord Grommet (as seen in Fig. 2B).
Step – 3: Correctly place the layer (Item # 1) back on the base by sliding the Locking notches in to the Notch Holders (see
Fig – 3 and 3A). Similarly place the Housing Cover Top and Lock it in with the Locking Assembly (Fig – 3B and 3C). Now
you are ready to put the 1” Nipple, Leveling Fitting for Fountain Kit, Diverter Valve and the Fountain Kit Complete in the
same order (Item #6, 5, 4, 3).
Pump Installation:
NOTE:
THE INSTRUCTIONS/IMAGES BELOW SHOW THE OPTIONAL UV STERILIZER RECOMMENDED FOR THE
FILTER. If you don’t have a UV Sterilizer just disregard the instructions on UV.
It is recommended that you service the pump every three months to enhance its efficiency and the life of the moving parts.
Before you start to service the pump –
Note
– If you have upgraded your UNO, DUO or TRIO Filter kit with an Optional
UV – You will first need to remove the UV bulb and Sleeve from the unit (see UV Installation below). By not doing this first
you risk cracking the Quartz Sleeve and UV Bulb.
To service the pump follow Step – 1 to remove the top cover, Filter layers and the Biological media bag. Now remove the
UV housing Cover by removing the screws that hold it in place (as seen in Fig – 4A).
Step – 4: Gently slide the UV Housing Cover (Item # 11) by first sliding it out from the pump and then the base UV seal
(as seen in Fig – 4B). The pump is locked onto the base with horizontal notches (as seen in Fig – 5A and 5B).
Fig – 3
Fig – 3A
Fig – 3B
Fig – 3C
Fig – 4A
Fig –4B
Fig – 4C
Fig – 3D
Fig –3E
Fig – 3F