12
Attach the left U Shape Bracket (23) to the left Crank (78) with one Bolt for left U Shape
Bracket (16L), one Ø28xØ17x0.3 Wave Washer (18), one 1/2” Spring Washer (20), and one
1/2” Left Nylon Nut (17L). Tighten bolt and nylon nut with the 8mm Allen Wrench and Multi
Hex Tool provided. Install a S13 Bolt Cap (31) onto the M8x50 Hexagon Head Bolt (26).
NOTE: Bolt for left U Shape Bracket (16L) and Bolt for right U Shape Bracket (16R) are
marked “R” for Right and “L” for Left.
Attach the Left Foot Pedal (36L) onto the Left Foot Bar (2L) with three M6 Nylon Nuts (27),
three Ø6 Washers (28), and three M6x40 Hexagon Head Bolts (29). Tighten nylon nuts
with the Multi Hex Tool with Phillips Screwdriver provided.
Attach the Foot Bar Covers-A/B (33L, 33R) onto the Left Foot Bar (2L) with two ST4.2x20
Screws (79). Tighten screws with the Multi Hex Tool with Phillips Screwdriver provided.
Repeat above step to attach the Right Handrail Arm (3R) onto the right horizontal axis of the
Front Post (5) and right U Shape Bracket (23) to the right Crank (78).
Hardware:
(16L) Bolt for left U
Shape Bracket
1 PC
(16R) Bolt for right U
Shape Bracket
1 PC
(17L) Left Nylon Nut 1/2”
1 PC
(17R) Right Nylon Nut 1/2”
1 PC
(18) Wave Washer
Ø28xØ17x0.3
2 PCS
(20) Spring Washer 1/2“
2 PCS
(31) Bolt Cap S13
2 PCS
(49) Bolt Cap S16
2 PCS
(27) Nylon Nut M6
6 PCS
(28) Washer Ø6
6 PCS
(29) Hexagon Head Bolt
M6x40
6 PCS
(79) Screw ST4.2x20
4 PCS