Introduction 5
1.5
Modes of Operation
1.5.1
Normal (Utility Power)
:KHQýWKHýXWLOLW\ýSRZHUýLVýDYDLODEOHýDQGýZLWKLQýDFFHSWDEOHýOLPLWVñýWKHýXQLWýVXSSOLHVýILOWHUHGýDQGý
UHJXODWHGýSRZHUýWRýWKHýORDGýWKURXJKýWKHýFRQYHUWHUýõLQSXWôýDQGýLQYHUWHUýõRXWSXWôïý7KHýEDWWHU\ý
FKDUJHUýPDLQWDLQVýDýFKDUJHýRQýWKHýEDWWHU\ï
1.5.2
On Battery
,IýWKHýXWLOLW\ýSRZHUýIDOOVýRXWVLGHýRIýDFFHSWDEOHýOLPLWVýõXVXDOO\ýORZýYROWDJHôñýWKHýEDWWHU\ýZLOOýVXSSOHð
PHQWýWKHýSRZHUýEHLQJýVXSSOLHGýE\ýWKHýFRQYHUWHUïý7KHýFRQYHUWHUýZLOOýFRQWLQXHýWRýRSHUDWHýLIýXWLOLW\ý
SRZHUýLVýDYDLODEOHïý8VLQJýERWKýVRXUFHVýSURYLGHVýORQJHUýEDWWHU\ýWLPHýLQýEURZQRXWýFRQGLWLRQVïý7KHý
836ýEDWWHU\ýLVýGHVLJQHGýWRýVXSSO\ýSRZHUýWRýDýIXOOýUDWHGýORDGýGXULQJýDýSRZHUýIDLOXUHïý2SWLRQDOýEDWð
WHU\ýFDELQHWVýDUHýDYDLODEOHýIRUýH[WHQGHGýUXQýWLPHVï
1.5.3
Battery Recharge
8SRQýUHWXUQýRIýDFFHSWDEOHýXWLOLW\ýSRZHUýDIWHUýEDWWHU\ýRSHUDWLRQñýWKHýEDWWHU\ýFKDUJHUýEHJLQVýWRý
FKDUJHýWKHýEDWWHULHVï
7KHýEDWWHU\ýFKDUJHUýFRPSHQVDWHVýIRUýEDWWHU\ýWHPSHUDWXUHïý,QýDGGLWLRQñýWKHýFKDUJHUýKDVýWZRý
UHFKDUJHýUDWHVñýXVHUðVHOHFWDEOHýWKURXJKýWKHý/&'ýGLVSOD\ïý
7KHýIDVWýRUý§WXUER¨ýUDWHýZLOOýUHFKDUJHýWKHýEDWWHULHVýWRýäèøýFDSDFLW\ýZLWKLQýìíýWLPHVýWKHýGLVFKDUJHý
GXUDWLRQïý7KHý§VORZ¨ýõGHIDXOWôýUDWHýZLOOýUHFKDUJHýWKHýEDWWHULHVýWRýäèøýFDSDFLW\ýZLWKLQýëíýWLPHVýWKHý
GLVFKDUJHýGXUDWLRQï
1.5.4
On Bypass
7KHý836WDWLRQý6êýFRPHVýZLWKýDýIXOO\ýUDWHGý6WDWLFý7UDQVIHUý6ZLWFKïý7KLVýDXWRPDWLFýVZLWFKýZLOOý
VXSSO\ýWKHýORDGýZLWKýXWLOLW\ýSRZHUýLQýWKHýHYHQWýRIýDý836ýPDOIXQFWLRQï
6WDWLFý7UDQVIHUý6ZLWFKã
ý,QýWKHýHYHQWýRIýRYHUORDGýFRQGLWLRQVýRUýLQYHUWHUýIDLOXUHñýWKHýVWDWLFýWUDQVð
IHUýVZLWFKýZLOOýWUDQVIHUýWKHýORDGýWRýE\SDVVïý:KHQýWKHýRYHUORDGýLVýUHPRYHGñýWKHýORDGýZLOOýEHýDXWRð
PDWLFDOO\ýUHWUDQVIHUUHGýWRýLQYHUWHUï
0DLQWHQDQFHý%\SDVVã
ý7KHýE\SDVVýSDWKýIRUýSRZHUýWRýWKHýFULWLFDOýORDGýFDQýEHýPDQXDOO\ýVHOHFWHGýE\ý
WKHýXVHUýLIýWKHUHýLVýDýQHHGýWRýURXWHýSRZHUýDURXQGýWKHý836ýLQýFDVHýRIýDý836ýIDXOWýRUýLIýPDLQWHQDQFHý
LVýWRýEHýGRQHýRQýWKHý836ïý8VHUýVHOHFWLRQýRIýWKHýPDLQWHQDQFHýE\SDVVýLVýPDGHýE\ýDýVZLWFKýEHKLQGýWKHý
IURQWýSDQHOýGRRUýLQýWKHýORZHUýOHIWýIURQWýRIýWKHý836ý0RGXOHïý:KHQýDFWLYDWHGñýWKHýXQLWýZLOOýWUDQVIHUý
WKHýORDGýWRýE\SDVVïý7KHý836ýORDGýZLOOýUHPDLQýRQýPDLQWHQDQFHýE\SDVVýXQWLOýXQVHOHFWHGýE\ýWKHýXVHUï
1.5.5
Remote Emergency Off
(DFKýXQLWýLQFOXGHVýDý7HUPLQDOý%ORFNýLQýWKHýXQLWýWRýHQDEOHý5HPRWHý(PHUJHQF\ý3RZHUý2IIýõ5(32ôý
IURPýDýFXVWRPHUðVXSSOLHGýVZLWFKïý$FWLYDWLQJýWKHýHPHUJHQF\ýRIIýZLOOýWXUQýRIIýWKHý&RQYHUWHUñý
,QYHUWHUñýDQGý6WDWLFý7UDQVIHUý6ZLWFKïý7KHýYROWDJHýWRýWKHýORJLFýZLOOýVWLOOýEHýPDLQWDLQHGïý
7RýFRQQHFWýWRýWKHý5(32ýIHDWXUHñýUHIHUýWRý
)LJXUH ìè
ýDQGý
)LJXUH ìçï
ý,IýXWLOL]LQJýDýQRUPDOO\ýRSHQý
VZLWFKñýFRQQHFWýZLUHýOHDGVýIURPýWKHýVZLWFKýWRýWHUPLQDOVýìýDQGýëýRIýWKHýWHUPLQDOýEORFNïý,IýXWLOL]LQJýDý
QRUPDOO\ýFORVHGýVZLWFKñýUHPRYHýWKHýZLUHýMXPSHUýEHWZHHQýWHUPLQDOVýëýDQGýêñýDQGýFRQQHFWýWKHýZLUHý
OHDGVýDFURVVýWHUPLQDOVýëýDQGýêïý
$
:$51,1*
7+(ý/2&$/ý(32ý$1'ý5(027(ý5(32ý'2ý127ý7851ý2))ý7+(ý
0$,17(1$1&(ý%<3$66ý,)ý7+(ý/2$'ý,6ý21ý0$,17(1$1&(ý
%<3$66ïý32:(5ý:,//ý127ý%(ý5(029('ý%<ý(32ý25ý5(32ïý
7+(ý86(5ý0867ý$/62ý6+87ý2))ý32:(5ý)520ý7+(ý)(('(5ý
72ý7+(ý836ïý
$
&$87,21
0DNHýVXUHýWKHUHýLVýQRýYROWDJHýRQýWKHý5(32ï
Summary of Contents for UPStation S3
Page 1: ...POWER PROTECTION UPStation S3 Three Phase 12 kVA to 24 kVA 50 and 60 Hz User Manual ...
Page 2: ......
Page 6: ...iv ...
Page 23: ...Installation 17 Figure 1 One Line Drawing Single Input Configuration 200 240V In Out ...
Page 24: ...18 Installation Figure 2 One Line Drawing Dual Input Configuration 200 240V In Out ...
Page 27: ...Installation 21 Figure 5 One Line Drawing Single Input Configuration 400 480 600V In 208V Out ...
Page 28: ...22 Installation Figure 6 One Line Drawing Dual Input Configuration 400 480 600V In 208V Out ...
Page 31: ...Installation 25 Figure 9 One Line Drawing Single Input Configuration 400 480 600V In Out ...
Page 32: ...26 Installation Figure 10 One Line Drawing Dual Input Configuration 400 480 600V In Out ...
Page 35: ...Installation 29 Figure 13 Cabinet Dimensions ...
Page 36: ...30 Installation Figure 14 Cabinet Dimensions With Transformer Cabinet ...
Page 37: ...Installation 31 Figure 15 Connecting Terminal Details ...
Page 38: ...32 Installation Figure 16 Connecting Terminal Details With Transformer Cabinet ...
Page 39: ...Installation 33 Figure 17 Battery Option Details 12 Inch Cabinet ...
Page 40: ...34 Installation Figure 18 Battery Option Details 24 Inch Cabinet ...
Page 41: ...Installation 35 Figure 19 Field Lug Wiring Terminations ...
Page 42: ...36 Installation Figure 20 Unloading Instructions ...
Page 43: ...Installation 37 Figure 21 Unloading Instructions 24 Inch Battery Cabinet ...
Page 44: ...38 Installation Figure 22 Battery Times ...
Page 53: ...Operation 47 Figure 25 Configuration Menu Tree ...
Page 55: ...Operation 49 Figure 26 Control Switch Locations ...
Page 68: ...62 Features Options Figure 27 RS 232 Connections ...
Page 69: ...Features Options 63 Figure 28 Output Distribution Panel Board ...