14 Chapter 2 Installation
Liebert ITA 16kVA/20kVA User Manual
z
3-in 1-out, common source configuration
Note
Except for the shorted copper bar 3, all the shorted copper bars mentioned in the installation procedures are the delivery
accessories.
1. Short the terminal bA, bB and bC of the single POD user terminal block using the shorted copper bar 7, short the
terminal oA, oB and oC using the shorted copper bar 5, and short mA and bA terminals using the shorted copper bar
6 and then short mN and bN terminals, two oN terminals respectively using two shorted copper bars 4, as shown in
Figure 2-9.
4
5
4
6
8
7
oN oN oA oB oC
mN bN mA bA mB bB mC bC
oN oN oA
oB oC
mN bN mA bA mB bB mC bC
PE
PE
PE
PE
Figure 2-9 Shorted copper bar connection for the single POD user terminal block
2. Connect the shorted copper bar 8 to one end of the shorted copper bar 7 (see Figure 2-9), and connect the live line
(input phase A) to the shorted copper bar 8.
3. Connect the live line (input phase B, phase C), N line and PE line respectively to mB and mC terminals of the
single POD user terminal block, shorted copper bars 4 of mN and bN terminals, and PE terminals.
4. Connect the live line (output phase A), N line and PE line respectively to the shorted copper bar 5 of the single
POD user terminal block, shorted copper bars 4 of the two oN terminals, and PE terminals.
5. Remove all the shorted copper bars 3 from the UPS I/O terminal block, and connect the UPS terminal block of the
single POD with the same silk screen terminal of the UPS I/O terminal block using the one-to-one correspondence
method.
6. As shown in Figure 2-10, you can paste the insulating film (accessory) to the shorted copper bar 10, and insert the
buckles into the corresponding holes on the shorted copper bar 10.
Assembling
Completion status
Insulating film
Shorted copper
Buckle
bar 10
Figure 2-10 Pasting insulating film to shorted copper bar 10
7. As shown in Figure 2-11, you can short two PE terminals of the UPS I/O terminal block using the shorted copper
bar 10 with insulating film, and connect two screw holes of the shorted copper bar 10 to the PE terminals of the single
POD.