background image

Precision Cooling
For Business-Critical Continuity

Liebert XDA

 Air Flow Enhancer

User Manual

Summary of Contents for Air Flow Enhander XDA

Page 1: ...Precision Cooling For Business Critical Continuity Liebert XDA Air Flow Enhancer User Manual...

Page 2: ......

Page 3: ...he Rear Cabinet Door 3 2 3 1 Prepare to Install the Unit 3 2 3 2 Mount the Unit and Attach it to the Cabinet 4 2 4 Mounting the XDA on the Interior of the Rear Cabinet Door 5 2 4 1 Prepare to Install...

Page 4: ...ii...

Page 5: ...mproves extraction of heat from high heat density equipment cabinets Permanently attached dual power cords to prevent accidental disconnection and increase up time Hot Installable No shutdown or remov...

Page 6: ...ify that the XDA unit voltage matches the available utility power The nameplate with this information is located on the top of the unit Note the XDA s appearance the front of the unit bears the Lie be...

Page 7: ...ounting height 3 Position the hanging support of the bracket toward the rear of the unit with the tabs of the bracket down and in front of the mounting angles 4 From the rear of the unit place screws...

Page 8: ...oes not interfere with operation of the door latch 3 Place screws through the middle and lower mounting holes of the XDA mounting angle and then through the door Place nuts on the screws and tighten t...

Page 9: ...screws removed in Step 1 above 5 Determine the desired mounting position on the door Place the bracket on the top of the door with the tabs on the outside The mounting bracket will be used to deter m...

Page 10: ...to minimize bypass air and maximize heat removal from the equip ment cabinet 1 Ensure that the cable openings in the raised floor beneath the cab inet are properly sealed Cool air from precision air...

Page 11: ...nded Ensure adequate length of the power cords when the door is fully opened Secure the power cords using the cable ties provided 3 1 Routing the Power Cords Through the Door Optional The power cords...

Page 12: ...f a power failure should occur on the primary power source the XDA will operate from the secondary source until the primary power source is restored The XDA will continue to operate as long as either...

Page 13: ...ICATIONS Nominal Capacity 1000 CFM 60Hz Dimensions W x D x H in mm 8 x 2 25 x 56 203 2 x 57 2 x 1422 4 Weight lbs kg 25 11 3 Electrical Specifications 120V 1 50 60Hz 230V 1 50 60Hz Amp Draw 1 5 A 120V...

Page 14: ...10...

Page 15: ......

Page 16: ...ax 39 049 5841 257 Asia 7 F Dah Sing Financial Centre 108 Gloucester Road Wanchai Hong Kong 852 2572220 Fax 852 28029250 The global leader in enabling Business Critical Continuity Business Critical Co...

Reviews: