Management-Handbuch
Produktion
Pack the Unit in protection foil.
Screw the „Etafon“ on the palette and then put the unit on.
Attention: There has to be 20mm space between the Incubator and the palette.
Packing_STX1000.doc
2010.10.18
Page 2 of 3
Page 1: ...ap fold it once and roll it Lift the Handling lift assembly by hand and place the roll under it Secure the Handler with air pad foil and safe the carrousel with the transport lock and etafon pads Transport lock Etafon pads to safe the carrousel Put air pad foil between the glass and Frontdoor Packing_STX1000 doc 2010 10 18 Page 1 of 3 ...
Page 2: ...h Produktion Pack the Unit in protection foil Screw the Etafon on the palette and then put the unit on Attention There has to be 20mm space between the Incubator and the palette Packing_STX1000 doc 2010 10 18 Page 2 of 3 ...
Page 3: ...read Screw in the screw heads flush Don t counterbore the screws in the wood Tape six corner pads on the front wall and screw it together with the palette Screw the sidewalls with the palette together Push the incubator completely to the front it has to be close to the corner pads Wind the transfer station in air pad foil and put this between the incubator and the ground Tape the back corner pads ...