Elevating Work Platform Operation Manual
26
Refueling Volume
Item
Parameters
Hydraulic oil (No.46)
50 L (replacement of oil)
Engine oil
(
CH-4 15W-40
)
5.1L
Diesel
53L
Reducer 80-90/w
0.68L
Outrigger
(
Optional
)
Item
Parameter/content
Machine weight (kg)
4440
Machine length(m)
3.76
Outrigger cylinder size
φ
63
×φ
45-600-863.4
Leveling angle(Front and rear)
5.7
°
/5.5
°
Leveling angle(Left and right)
12
°
Note: When hydraulic oil and diesel are filled, it is necessary to use the corresponding hydraulic oil and
diesel according to operating environment and temperature, and refer to the following contents
:
L-HM 46 antiwear hydraulic oil: minimum air temperature
>
-9
℃
;
L-HV 46 low temperature hydraulic oil: -33
℃<
minimum air temperature
≤
-9
℃
;
L-HS 46 Ultralow temperature hydraulic oil: -39
℃<
minimum air temperature≤-33
℃
10# aviation hydraulic oil: minimum air temperature ≤-39
℃
;
.
Use temperature
Diesel
air temperature≥4
℃
0 #Diesel
air temperature≥-5
℃
-10 #Diesel
air temperature≥-14
℃
-20 Diesel
air temperature≥-29
℃
-35 Diesel
Summary of Contents for SR1018D
Page 7: ...Elevating Work Platform Operation Manual V...
Page 8: ...Elevating Work Platform Operation Manual 1 Chapter 1 Safety...
Page 9: ...Elevating Work Platform Operation Manual 2...
Page 16: ...Elevating Work Platform Operation Manual 9 Chapter 2 Machine Nomenclature...
Page 17: ...Elevating Work Platform Operation Manual 10...
Page 19: ...Elevating Work Platform Operation Manual 12...
Page 20: ...Elevating Work Platform Operation Manual 13 Chapter 3 Decals and Warning Labels...
Page 21: ...Elevating Work Platform Operation Manual 14...
Page 22: ...Elevating Work Platform Operation Manual 15 SR1018D SR1218D Decals Diagram...
Page 24: ...Elevating Work Platform Operation Manual 17 SR1018D SR1218D Decals...
Page 25: ...Elevating Work Platform Operation Manual 18...
Page 26: ...Elevating Work Platform Operation Manual 19 SR1023D SR1323D SR1623D Decals Diagram...
Page 28: ...Elevating Work Platform Operation Manual 21 SR1023D SR1323D SR1623D Decals...
Page 29: ...Elevating Work Platform Operation Manual 22...
Page 30: ...Elevating Work Platform Operation Manual 23 Chapter 4 Specifications...
Page 31: ...Elevating Work Platform Operation Manual 24...
Page 55: ...Elevating Work Platform Operation Manual 48 air temperature 29 35 Diesel...
Page 59: ...Elevating Work Platform Operation Manual 52...
Page 60: ...Elevating Work Platform Operation Manual 53 Chapter 5 Control Station...
Page 61: ...Elevating Work Platform Operation Manual 54...
Page 82: ...Elevating Work Platform Operation Manual 75 Chapter 6 Pre Operation Check...
Page 83: ...Elevating Work Platform Operation Manual 76...
Page 86: ...Elevating Work Platform Operation Manual 79 Chapter 7 Workplace Check...
Page 87: ...Elevating Work Platform Operation Manual 80...
Page 89: ...Elevating Work Platform Operation Manual 82...
Page 90: ...Elevating Work Platform Operation Manual 83...
Page 91: ...Elevating Work Platform Operation Manual 84 Chapter 8 Functional Test...
Page 92: ...Elevating Work Platform Operation Manual 85...
Page 96: ...Elevating Work Platform Operation Manual 89...
Page 97: ...Elevating Work Platform Operation Manual 90...
Page 98: ...Elevating Work Platform Operation Manual 91 Chapter 9 Operation Instructions...
Page 99: ...Elevating Work Platform Operation Manual 92...
Page 104: ...Elevating Work Platform Operation Manual 97...
Page 105: ...Elevating Work Platform Operation Manual 98 Chapter 10 Transportation and Lifting Instructions...
Page 106: ...Elevating Work Platform Operation Manual 99...
Page 109: ...102...