16
2 - INSTALLATION AND START-UP
HORIZONTAL SET-UP VERSION
For the installation of the feeder onto the machine, proceed as follows:
- using screw (G) fix clamp (F) underneath the feeder; fix the clamp onto the
machine tube using the grub screws (H) located in the clamp, and position
the yarn feeder so that it is set into the exact angle required for operation.
F
G
H
H
AC
DC
02_ECOpower_Rv0_ENG@01# 28/08/14 18.26 Pagina 16