17
➊
Push the button 2-3 times
when the dust is filled in
the dustbin while cleaning
➋
When the dust is fully
filled after cleaning,
take the bin and turn it
counterclockwise to
disconnect
➌
Waste the dust in the bin
➍
Take the bin to fix into the
projection part and then turn it
clockwise to connect.