1. HEAT PUMP
Refrigeration Cycle Diagram
2. COOLING ONLY
INDOOR UNIT
OUTDOOR UNIT
INDOOR UNIT
OUTDOOR UNIT
HEAT EXCHANGER
(
EVAPORATOR
)
HEAT EXCHANGER
(
EVAPORATOR
)
HEAT EXCHANGER
(
CONDENSER
)
HEAT EXCHANGER
(
CONDENSER
)
COMPRESSOR
COMPRESSOR
GAS SIDE
LIQUID SIDE
GAS SIDE
LIQUID SIDE
CAPILLARY TUBE
CAPILLARY TUBE
CAPILLARY TUBE
SOLENOID VALVE
COOLING
HEATING
REVERSING
VALVE
Gas
Liquid
Elevation
(
m
)
Piping length
(
m
)
* Additional
refrigerant
(g/m)
Pipe size (mm)
Rated
Rated
Max.
Max.
( Diameter )
9. 25
6. 35
5
15
7
20
5
MODEL
12.7
6. 35
5
15
7
30
5
H/P SW
– 9 –
TB-H096*
TB-C096*
TB-H126*
TB-C126*
• Rated performance for refrigerant line length of: 5m.
• If 12K Model is installed at a distance of 15m, 300g of refrigerant should be added (15-5)x30g=300g.