5-11
COMPONENTS
TEST PROCEDURE
RESULTS
FUSE
Check for continuity of the fuse with an
multi-meter.
NOTE: If the fuse is blown, check the primary, the secondary, and the monitor
switches, H.V.D. and H.V.C. before replacing the fuse.
If the fuse is blown by improper switch operation replace the defective switch
and the fuse at the same time. Replace just the fuse if the switches operate
normally.
Normal Abnormal
HEATER ELEMENT
(Wire leads removed.)
Measure the resistance.
(Multi-meter scale: Rx1)
Measure the resistance with 500V-100M ohm
insulation resistance meter.
NOTE: Make sure heater is fully cooled when tested.
Normal:
• Upper sheath heater:
Approx. 12 ohm (120V, 1200W)
• Lower sheath heater:
Approx. 38 ohm (120V, 375W)
• Upper Ceramic heater:
Approx. 27 ohm (120V, 500W)
• Upper Halogen heater:
Approx. 2.7 ohm (120V, 500W)
(at 20 ~30°C)
MAGNETRON and OVEN
THERMOSTAT
OVEN Thermostat
0°C~160°C 160°C
M.G.T Thermostat
0°C~Approx.145°C Approx.145°C
Normal: more than 0.5 Mohm
Summary of Contents for SolarDOM MP-1283SL
Page 9: ...SCHEMATIC DIAGRAM 4 3 ...
Page 37: ... 41 ...