8
AHU Control Kit
Before Installation
Selection of Evaporator(Air Handling Unit)
See table below for applicable units
Selecting the capacity setting 'Option PCB'(Accessory) according to the capacity mentioned below.
- The corresponding capacity setting 'Option PCB' needs to be selected depending on the need
capacity.
- After checking the need capacity, remove the 24k Option PCB equipped in the main PCB,
and set up the Option PCB fitted the need capacity in the main PCB.
CAUTION
Saturated Suction Temperature (SST) = 6°C, SH (Superheat) = 5K, Air Temperature = 27°C DB / 19°C WB.
(Main PCB)
Capacity setting
'Option PCB'
Detail
(Main PCB)
Option PCB
P/NO
Capacity
(Btu/h)
Standard heat
exchanger volume
(10
3
× m
3
)
Maximum heat
exchanger capacity
(kW)
Air Flow rate
(CMM)
EBR65102901
12 k
2.2
3.5
9~10
EBR65102902
18 k
2.4
5.0
13~16.5
EBR65102903
24 k
2.6
7.1
14~18
EBR65102904
30 k
2.9
8.0
20~26.5
EBR65102905
36 k
3.1
10.0
26.5~32
EBR65102906
42 k
3.4
12.5
28~36
EBR65102907
48 k
4.0
14.0
30~40
EBR65102908
60 k
4.7
15.0
40~50
EBR52358920
70 k
5.2
20.0
60~70
EBR52358921
85 k
5.9
23.0
64~80