10
Installation
criteria and
example
Power condition and switchboard
configuration for PLS installation
• Because the power consumption per 1 set of PLS is high,
the cross sectional area of the switchboard must
appropriately be applied, and for stable operation, one
control switch must be installed for each set.
• Grounding requires more than 3 grounding points and must
be wired for safety purposes.
Note)
MCCB: Molded Case Circuit Breaker
ELB: Earth Leakage Circuit Breaker
Use rate sensitivity current (Break current) of 30 [mA]
MS: Magnetic Switch (Used when applying GPS or auto flash device)
* PLS is not equipped with a terminal block. For installation, please get professional
assistance.
- Terminal Block Specification
(a) Rated Voltage: 250V or above
(b) Rated Power: 10A or above
(c) 3 way bolt fastening type
- After connecting power line to the terminal block, ensure that the power line makes
secure contact with fastening bolt or clamp and the power line is securely fastened.
PLS switchboard
(When installing 6 sets)
Apply
14.0 mm
2
or above
MCCB
75A or
above
Apply 2.0 mm
2
or above for
each line
Recommended to
apply ELB, MS
capacity of 10A
• After wiring power line to terminal box, check if the line touches tightening bolt or
clamp or is being forced.
• Use regulated electric wire so connecting part of terminal is knocked out by external
force. It can cause fire if connecting part is fixed tightly as it generates heat.
• Wire power line after ring terminal work. It can cause fire and failure of electric parts.
• Check Neutral status when installing main power
• Ending part of PLS has to be waterproof when connecting it to terminal.
WARNING
Summary of Contents for PSF1032A
Page 18: ...18 Memo ...
Page 19: ...19 Memo ...