5-10
COMPONENTS
TEST PROCEDURE
RESULTS
1
3
5
Relay 2
Relay 1
FUSE
THERMAL
CUT-OUT
Disconnect the 7 pin
connector from P.C.B.
(Refer to schemetic diagram)
RELAY 2 OF P.C.B.
(Wire leads removed.)
Note: Relay
Relay 1: Fan motor
Turntable motor
Oven lamp
Relay 2: Microwave
Check for continuity of the fuse with an
multi-meter.
NOTE: If the fuse is blown, check the primary, the secondary, and the monitor switches,
H.V.D. and H.V.C. before replacing the fuse.
If the fuse is blown by improper switch operation replace the defective switch and the
fuse at the same time. Replace just the fuse if the switches operate normally.
Check for P.C.B. connector.
Normal Abnormal
0°C~Approx.110°C Approx.110°C
Cooking Start OFF
Cooking Start OFF
Summary of Contents for MS-1947C
Page 9: ...SCHEMATIC DIAGRAM 4 3 6 ...
Page 29: ...6 2 13536A 13581A 14970A 14026A 13552A 13213A 14890A 13720D DOOR PARTS EV ...
Page 30: ...6 3 23506A 23572A 268711 24781M WTT021 CONTROL PANEL PARTS EV ...
Page 31: ...6 4 33390G WTT021 33112U WTP013 36549S 33052A WTT010 35889A OVEN CAVITY PARTS EV ...
Page 32: ...6 5 466003 466001 43501A 43500A 466001 WSZ085 44510A LATCH BOARD PARTS EV ...
Page 34: ...6 7 56170D 63302A WSZ002 WTT021 65006B 63303A BASE PLATE PARTS EV ...
Page 35: ......