ENGLISH
7
THE INDOOR UNIT INSTALLATION
Level gauge
Ceiling
Ceiling board
875(34-7/16) (Ceiling opening)
585(23-1/16)~660(26) (Ceiling opening)
58
5(23-
1/
16)~660(26) (
Ceiling opening)
8
7
5(34-
7/
16) (
C
eiling opening)
787(30-15/16)
(Hanging bolt)bolt)
684( 26- 15/ 16)
Panel size : 950(37-3/8) x 950(37-3/8) mm
Panel size : 700(27-9/16) x 700(27-9/16) mm
[TM/TN/TP Chassis]
Unit:mm(inch)
[TQ/TR Chassis]
Unit:mm(inch)
6
7
1(26-
7
/1
6)
517(20-3/8)
461(18-1/8)
517(20-3/8)
523(20-9/16)
570
(22-7/16)
570
(22-7/16)
319
(12-9/16)
840(33-1/16)
Unit size
84
0(
33-
1/
16)
Unit siz
e
CAUTION
!
• This air-conditioner uses a drain pump.
• Install the unit horizontally using a level
gauge.
• During the installation, care should be
taken not to damage electric wires.
THE INDOOR UNIT INSTALLATION
- Select and mark the position for fixing bolts
and piping hole.
- Decide the position for fixing bolts slightly
tilted to the drain direction after considering
the direction of drain hose.
- Drill the hole for anchor bolt on the wall.
- When using cardboard on the bottom of
packaging, use after separating installation
paper from bottom of the product packaging
using back of a knife as shown in the picture
(TM/TN/TP)
Included Paper
Cardboard on the bottom
of packaging
NOTE
!
Avoid the following installation location.
1
Such places as restaurants and kitchen
where considerable amount of oil steam
and flour is generated. These may cause
heat exchange efficiency reduction, or
water drops, drain pump mal-function. In
these cases, take the following actions;
- Make sure that ventilation fan is enough
to cover all noxious gases from this
place.
- Ensure enough distance from the cooking
room to install the air conditioner in such
a place where it may not suck oily steam.