channel.
2. Use a
”
drill bit to drill a starter hole through
the top hole in the side curtain and into the
window sash.
3.
Insert one of the
”
screws through the top
hole of the lefthand curtain and into the
window sash.
4. Repeat for the right-hand curtain.
Attach Side Curtains to Window
Top View
Bottom View
5.
Use a
”
drill bit to drill a starter hole through
the bottom hole in the side curtain and into
the window frame.
6.
Insert one of the
”
screws through the
bottom hole of the left-hand curtain and into
the window frame.
7. Repeat for the right-hand curtain.
Completing the Installation
A
B
1.
Insert the foam seal behind the top of the
lower window sash and against the glass of
the upper window.
A. Top of lower window sash
B. Foam seal
B
A
2. Place the window lock bracket as shown. Use a
”
drill bit to drill a starter hole through the hole
in the window lock bracket and into the upper
window.
3. Attach the window lock bracket to the upper
window with one
”
screw to secure the
window in place.
4.
After installation is complete, check that the
unit is tilting downward toward the outside,
for proper condensate drainage.Plug into a
grounded 3 prong outlet.
5.
Press RESET on the power supply cord.
See “Electrical Requirements.”