12
Room Air Conditioner
Installation
Installation Kits Contents
Suggested Tool Requirements
PREPARATION OF CHASSIS
1. Remove the screws which fasten the cabinet
at both sides and at the back.
2. Slide the unit from the cabinet by gripping the
base pan handle and pulling forward while
bracing the cabinet.
3. Cut the window sash seal to the proper
length.
Peel off the backing and attach the foam-pe
to the underside of the window sash.
4.
5.
6.
Insert the frame guides
into the bottom of
the cabinet.
Insert the Frame Curtain
into the upper
guide and frame guides
.
Fasten the curtains to the unit with 4 Type
A screws.
SCREW, -), RULER, KNIFE, HAMMER, PENCIL, LEVEL
NO.
NAME OF PARTS
Q'TY
1
FRAME CURTAIN
2
2
SILL SUPPORT
2
3
BOLT
2
4
NUT
2
5
SCREW(TYPE A)
1
3
6
SCREW(TYPE B)
3
7
SCREW(TYPE C)
5
8
FOAM-STRIP
1
9
DRAIN PIPE
1
10
11
FRAME GUIDE
2
12
WINDOW LOCKING BRACKET
1
FOAM-PE
1
1
2
3
4
8
1
2
7
6
5
1
1
1
0
9
5
5
5
1
0
1
0
(Type A)
(Type A)
Upper guide
1
0
1
0
1
2
11
Shipping
Screws
Summary of Contents for LW7010HR
Page 42: ...42 Aire Acondicionador Nota ...