19
General Installation Guidelines
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
GENERAL INSTALLATION GUIDELINES
Bolt
Refrigerant Pipe
Connection Location
Top of Outdoor Unit
(Looking Down)
Bolt
Bolt
Bolt
Bolting the Outdoor Unit to the Platform
1. Ensure that the concrete platform will not degrade easily, and has enough
strength to bear the weight of the unit.
2. Include an H-beam support. Firmly attach the corners, otherwise the support
will bend.
3. Use a hexagon nut.
4. Use anti-vibration material.
5. Include enough space around the concrete foundation for condensate
drainage.
6. Seal all wiring and piping access holes to prevent insects from entering the
unit.
Outdoor Unit Foundation Requirements.
Minimum
8
7-7/8
15-3/4
Minimum 24-13/32
Unit: Inch
Outdoor Unit Type
Bolt
Type
Concrete Height
Bolt Depth
LUU188HV, LUU248HV M10-J
Minimum 4 inches
Minimum 3 inches
LUU368HV, LUU428HV,
LUU488HV
M10-J
Minimum 8 inches
Minimum 3 inches
Table 5:
Outdoor Unit Foundation Specifications.
Figure 7: LUU188HV and LUU248HV Outdoor Units.
Outdoor Unit Platform Requirements
Figure 8: LMU368HV, LMU428HV, LMU488HV Outdoor Units.
Figure 9: Bolting the Outdoor Unit to the Platform (Piping
Location May Differ Depending on Outdoor Unit Model).
Minimum
3-15/16)
21-1/2
Minimum 14-9/16
Unit: Inch
Summary of Contents for LV420HV
Page 69: ...NOTES ...