-19-
CAUTIONS
1. DISCONNECT THE POWER SUPPLY CORD FROM THE OUTLET WHENEVER REMOVING THE OUTER CASE
FROM THE UNIT. PROCEED WITH THE TEST ONLY AFTER DISCHARGING THE HIGH VOLTAGE CAPACITOR
AND REMOVING THE WIRE LEADS FROM THE PRIMARY WINDING OF THE HIGH VOLTAGE
TRANSFORMER.
2. ALL OPERATIONAL CHECKS WITH MICROWAVE ENERGY MUST BE DONE WITH A LOAD (1 LITER OF
WATER IN CONTAINER) IN THE OVEN.
COMPONENTS
TEST PROCEDURE
RESULTS
HIGH VOLTAGE
TRANSFORMER
(Wire leads removed)
MAGNETRON
(Wire leads removed)
1. Measure the resistance.
(Select the ohm scale on the meter)
• Primary winding
• Secondary winding
• Filament winding
2. Measure the resistance.
(Select the ohm scale on the meter)
• Primary winding to ground
• Filament winding to ground
1. Measure the resistance.
(Select the ohm scale on the meter)
• Filament terminal
2. Measure the resistance.
(Select the ohm scale on the meter)
• Filament to chassis
Approx.: 0.7 ~ 0.9 ohm
Approx.: 90 ~ 120 ohm
Less than: 1 ohm
Normal: Infinite
Normal: Infinite
Normal: Less than 1 ohm
Normal: Infinite
FILAMENT
WINDING
PRIMARY
TERMINAL
SECONDARY
WINDING
11. TEST AND CHECKOUT PROCEDURES, AND TROUBLESHOOTING
A. TEST PROCEDURES
Summary of Contents for LTM9020B
Page 35: ... 34 WTP013 35889A 34370T 36549S 33390G WTT010 WTT020 WSZ185 33052A 33112U OVEN CAVITY PARTS ...
Page 36: ... 35 WSZ085 56912B 55262A 44510A 43500A 466001 466003 466001 43501A LATCH BOARD PARTS ...
Page 38: ... 37 56170D 63303A WSZ002 WTT021 WTT028 647781 65006A 63302A WTT021 BASE PLATE PARTS ...
Page 40: ... 43 SCHEMATIC DIAGRAM OF P C B ...
Page 41: ...PRINTED CIRCUIT BOARD 44 ...
Page 42: ... 45 ...