- 87 -
- Measure the voltage between the POWER and COMM pins of the connector as shown below.
Check to make sure compressor is receiving voltage from IPM
- In order to determine whether the compressor is operating normally,
check the output voltage during the refrigeration cycle.
- After initial power-up, when the compressor begins to operate, wait 10
minutes before checking.
- The compressor is operating normally if the voltage is greater than 80V.
IPM Output check
Summary of Contents for LFXC24726S
Page 7: ... 7 ...
Page 21: ... 21 5 CIRCUIT DIAGRAM ...
Page 22: ... 22 6 TROUBLESHOOTING ...
Page 23: ... 23 ...
Page 25: ... 25 7 3 Sub PCB ...
Page 102: ... 102 13 DESCRIPTION OF FUNCTION CIRCUIT OF MICOM ...
Page 103: ... 103 ...