The air conditioner uses a drain pump to dr
ain water
.
Use the follo
wing procedure to test the drain pump oper
ation:
• Connect the
main dr
ain pipe
to the
exter
ior
an
d le
av
e it
pro
vis
io
na
lly
un
til
th
e t
es
t
comes to an end.
• F
ee
d wa
te
r to
th
e fl
exi
ble
dra
in
ho
se
an
d
check the piping f
or leakage.
• Be sure
to chec
k the
drain
pump for
normal
operating
and noise
when electr
ical wir
ing
is complete.
• W
he
n th
e te
st
is
co
mp
le
te
, c
on
ne
ct
th
e
flexib
le dr
ain hose
to the
drain
port
on the
indoor unit.
Drain test
Feed w
ater
Drain Pump
Drain pan
Flexib
le drain hose
Main
drain pipe
Glue the joint
Drain
port
Drain hose connection
Use the clip
• Drain
piping m
ust ha
ve
down-slope
(1/50 to
1/100): be
sure not
to
provide up-and-do
wn slope to prevent re
versal flo
w.
• Dur
ing dr
ain piping
connection, be
careful not
to ex
ert
extr
a force
on the drain por
t on the indoor unit.
• The
outside diameter
of the
drain
connection on
the indoor
unit is
32mm.
• Be sure to install heat insulation on the dr
ain piping.
Pip
in
g m
ate
ria
l:
Po
ly
vin
yl
ch
lo
rid
e p
ip
e V
P-2
5 a
nd
pipe fittings
Heat insulation
material:
P
olyeth
ylene foam
with thic
k-
ness more than 8 mm.
Upward
routing
not allow
ed
Pipe clamp
Maintenance
drain por
t
Indoor unit
D). Drain Piping
7
CA UTION:
After the confirmation of the abo
ve conditions
, prepare the wiring as f
ollows:
1) Ne
ver fail to have an individual po
wer specialized f
or the air conditioner. As f
or the method of
wiring, be guided b
y the circuit dia
gram posted on the inside of control bo
x cover
.
2) Pro
vide a circuit breaker s
witch between po
wer source and the unit.
3) The scre
ws which fasten the wiring in the casing of electrical fittings are liab
le to come loose
from vibrations to whic
h the unit is subjected during the course of transpor
tation. Chec
k them
and make sure that they are all tightl
y fastened. (If the
y are loose, it could give rise to b
urn-out
of the wires.)
4) Specification of power sour
ce
5) Confirm that electrical capacity is sufficient.
6) Be sure that the star
ting volta
ge is maintained at more than 90 per
cent of the rated volta
ge
1/50~1/100 slope
Hanger
distance
Hanger Brac
ket
Max 700mm
Flexib
le drain hose
Insulation
Metal
clamp
Max 300mm
1~15m
CA UTION :
The supplied fle
xible drain
hose should not be curved,
neither
screwed.
The cur
ved or screwed hose
may cause a leaka
ge of water
.
marked on the name plate.
7) Confirm that the cab
le thickness is as specified in the po
wer sources specification.
(Par
ticularly note the relation between cab
le length and thickness.)
8) Never fail to equip a leaka
ge breaker where it is wet or moist.
9) The f
ollowing tr
oubles w
ould be caused by v
oltag
e drop-do
wn.
• Vibr
ation of a magnetic switch, damage on the contact point, fuse breaking, disturbance b
y the nor-
mal function of an over
load protection device
.
• Proper star
ting pow
er is not given to the compressor
.
Summary of Contents for JBNQ18GB2A2
Page 8: ...Cooling Mode 8 ...
Page 9: ...Auto Operation Mode 9 ...
Page 10: ...Dehumidification Mode 10 ...
Page 12: ...Temperature Setting Room Temperature Checking 12 ...
Page 13: ...Timer 13 ...
Page 17: ...Self diagnosis Function 17 ...
Page 20: ...Wide LCD Wired Remote Controller Optional 20 ...
Page 21: ......
Page 22: ...27 Installer Setting Setting Address of Central Control ...
Page 24: ...Installer Setting How to enter installer setting mode 25 ...
Page 32: ...MEZ66178925 JB Q18GB2A2 R 410A Gas charge model ...