LG HS200 Service Manual Download Page 5

Copyright © 2009 LG Electronics. Inc. All right reserved. 
Only for training and service purposes

- 5 -

LGE Internal Use Only

1. Application Object

This  instruction  is  for  the  application  to  the  DLP Projector
(Chassis: FM91A).

2. Notes

(1) The  power  source  insulation  of  this  DLP  Projector  is  not

charging  type  and  you  may  not  use  the  transformer  for
insulation.  It  is  advised  to  use  an  insulation  transform
between the power supply cable and power input of the set
to protect  the test equipment.

(2)  The  adjustment  must  be  performed  under  the  correct

sequence.

(3) The adjustment must be performed in the circumstance of

25±5°C of temperature and 65±10% of relative humidity.

(4) The set must be on for 5 minutes prior to any adjustment.

After receiving possible 100% White Pattern, it is ready for
adjustment.

3. Composition of Adjustment Mode

(1)  Pressing  the  adjust  key  on  the  service  remote  conrol  will

open or close the service menu.

(2) Press the ADJ key to exit the service menu.
(3) Preparation for Adjustment

1) Power is connected in set to be power on.
2) Do heat run 5minutes.

4. Folding Mirror Adjustment

4-1. Illuminator Adjustment Sequence

After  putting  the  optical  engine  on  the  jig,  check  whether  the
mirror  part  is  fixated  vertically.  At  this  time  the  screen  size
should  be  based  on  40”.  With  the  screen  in  full  white
condition, look at the change in screen and brightness of the
illuminator to make appropriate adjustments.

(1) Up and Down Adjustment

1)  Turn  screw  (A)  up  /  down  adjustment  to  the  right  and

mark where the image is aligned.

2)  Turn  screw  (A)  up  /  down  adjustment  to  the  left  and

mark where the image is aligned.

3)  Turn  screw  (A)  up  /  down  adjustment  to  the  right  /  left

and  mark  where  the  image  is  aligned.  Fix  the
adjustment screw in position.

(2) Left and Right Adjustment 1

1)  Turn  screw  (B)Left  /  Right  adjustment  to  the  right  and

mark where the image is aligned.

2)  Turn  screw  (B)  Left  /  Right  adjustment  to  the  left  and

mark where the image is aligned.

3)  Turn  screw  (B)Left  /  Right  adjustment  to  the  right  /  left

and  mark  where  the  image  is  aligned.  Fix  the
adjustment screw in position.

(3) Left and Right Adjustment 2

1)  Turn  screw  (C)up  /  down  adjustment  to  the  right  and

mark where the image is aligned.

2)  Turn  screw  (C)  up  /  down  adjustment  to  the  left  and

mark where the image is aligned.

3)  Turn  screw  (C)up  /  down  adjustment  to  the  right  /  left

and  mark  where  the  image  is  aligned.  Fix  the
adjustment screw in position.

ADJUSTMENT INSTRUCTION

B

Right/Left Adjustment

Up/Down Adjustment

A

<Fig. 4-1> Check location of the bottom side of the folding mirror

Step 1

Step 2

Step 3

<Fig. 2> Illuminator Up / Down Adjustment Sequence

Step 1

Step 2

Step 3

<Fig. 3> Illuminator Left/Right Adjustment Sequence 1

Step 1

Step 2

Step 3

<Fig. 4-2> Illuminator Left/Right Adjustment Sequence 2

Summary of Contents for HS200

Page 1: ...CAUTIONS IN THIS MANUAL CHASSIS FM91A MODEL HS200 HS200G HS200 HS200G JE MODEL HS201 HS201G HS201 HS201G JE North Latin America http aic lgservice com Europe Africa http eic lgservice com Asia Oceania http biz lgservice com Internal Use Only Printed in Korea P NO MFL62350102 0912 REV00 ...

Page 2: ...tronics Inc All right reserved Only for training and service purposes 2 LGE Internal Use Only CONTENTS CONTENTS 2 SAFETY PRECAUTIONS 3 SPECIFICATIONS 4 ADJUSTMENT INSTRUCTION 5 BLOCK DIAGRAM 11 EXPLODED VIEW 13 SVC SHEET 14 ...

Page 3: ...y it s Neck Leakage Current Cold Check Antenna Cold Check With the instrument AC plug removed from AC source connect an electrical jumper across the two AC plug prongs Place the AC switch in the on positioin connect one lead of ohm meter to the AC plug prongs tied together and touch other ohm meter lead in turn to each exposed metallic parts such as antenna terminals phone jacks etc If the exposed...

Page 4: ...e of each parts are followed each drawing and specification by part number in accordance with BOM 5 The receiver must be operated for about 30 minutes prior to the adjustment 3 Test method 1 Performance LGE TV test method followed 2 Demanded other specification Safety CE specification EN55022 Class A EMC CE EBN60950 1 No Item Specification Remark Min Max Unit 1 Video input applicable system 1 NTSC...

Page 5: ...on 40 With the screen in full white condition look at the change in screen and brightness of the illuminator to make appropriate adjustments 1 Up and Down Adjustment 1 Turn screw A up down adjustment to the right and mark where the image is aligned 2 Turn screw A up down adjustment to the left and mark where the image is aligned 3 Turn screw A up down adjustment to the right left and mark where th...

Page 6: ...al line Up down screw A Right tighten direction Adjustment part Screen state Initial state State after adjusting Screw direction Description At first upside illuminator goes down and right illuminator also goes down in detail Left loosen direction At first downside illuminator goes down and left illuminator also goes down left right screw B Right tighten direction At first left illuminator goes do...

Page 7: ... DMD If necessary keep under observation 3 Don t clean the DMD with the high pressure The static electricity and pressure will damage the DMD 6 EDID Data Download 1 Enter to Adjustment mode by pressing ADJ key on Adjustment Remote control Without RGB HDMI jack 2 Press right key at 4 EDID DOWNLOAD And then EDID Download is operated Fig 6 1 3 Check the EDID Download of RGB HDMI by pressing INSTART k...

Page 8: ...et Cool Fail White Balance Process Successful and Cool chromaticity diagram deviated more than 0 005 from the target Warm and Cool Fail White Balance Process Successful and both Warm can Cool chromaticity diagrams deviated more than 0 005 from the target 5 For verification of White Balance adjustment results press Instart Key and enter Manual CCA Fig 8 3 2 Fig 8 3 1Selection Category on INSTART Me...

Page 9: ...t capable of audio output 4 1 RCA to Stereo cable 10 2 Equipment Composition 10 3 Adjustment Method 1 Organize as shown on Fig 8 1 and configure as shown below FM Radio Set frequency to 90Mhz Projector Enter MENU AUDIO and select FM Wireless Audio ON with the remote control DVD Player or Set top box Play the source capable of audio output 2 Verify the audio output of FM Radio by repeating ON OFF O...

Page 10: ...rvice purposes LGE Internal Use Only 1 Connect 70pin FFC to P504 on Main board 4 Connect LED Fan cable to P901 P902 P903 P701 on Main board 2 Connect Speaker cable to P2 on Jack board 5 Assemble two screw to Main board 3 Connect Main board_70p FFC to DMD board_P201 6 Connect 20p FFC to P102 on Main board ...

Page 11: ...Copyright 2009 LG Electronics Inc All right reserved Only for training and service purposes 11 LGE Internal Use Only BLOCK DIAGRAM 1 MAIN ...

Page 12: ...A0372 12 12 V Power 0 0 2 A 1 0 0 2 A Pin Pin W W 21 4261 80 80 25 25 19 19 5 V MP2305 1 1 2 V 5 5 0 V 0 0 09412 9412 A 2 1 1 30 30 A 0 0 02 A 19 19 5 V MP2305 1 1 26 26 V 0 0 08362 8362 A 2 1 1 10 10 A 19 19 5 V MP2355 3 3 3 V 3 3 3 V AZ1117H 1 8 1 1 8 V 0 0 61 61 A 2 3 3 0 A 0 0 8 A 1 0 0 8 A 3 3 3 V KIA78R25F 2 2 5 V 2 2 5 V AZ1117H 1 2 1 1 2 V 0 0 5 A 1 0 0 52 525 A 0 0 4 A 1 0 0 12 125 A 3 3 ...

Page 13: ... 13 Copyright LG Electronics Inc All right reserved Only for training and service purposes LGE Internal Use Only EXPLODED VIEW 540 400 600 521 520 620 522 410 630 100 510 511 300 610 420 800 120 ...

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Reviews: